Go to Top

Bakeri swara (Baroda)

  • Project Details

  • Feature & Amenities

  • Specification

  • Home Loans

  • Gallery

  • Life & Time

  • Brochure

  • Floor Plans

  • Current Progress

  • Compliances

Booking Form

Drop an Enquiry

 

slide3Bakeri Swara is the first phase of development, at the site, with potential development of more than 700 residential units.
The Project is located at south of Manjalpur, Beside ABB Campus,Vadodara.

Project Type:

The project consists of 472 well - designed 2-3-4 BHK homes. All buildings are parking + 8/9 Floors.
The project has well developed common amenities along with adequate parking spaces for two and four wheelers.
     
  

RERA Reg No. : PR/GJ/VADODARA/VADODARA/Others/RAA00359/061017

Drop an Enquiry


Bakeri Swara

South of Manjalpur, Beside ABB,NR. ERDA, Old NH 8, Vadodara.
Mo. No :- +91 97277 68215
Email : [email protected]

In this strenuous world, physical fitness is your prerogative. We take care of your fitness and relaxation by providing:

  • Multipurpose activity court
  • Clubhouse with well equipped gym
  • Jogging track along the central park
  • Children play area and splash pool
  • Huge garden as good as a football field
Other Amenities

  • Well appointed entrance lobby
  • Multipurpose hall
  • School bus pick up stand
  • Wheelchair friendly access
  • 2 Free allotted two wheeler and 1 free four wheeler parking
  • Party kitchen with open plot
  • Intercom service
  • Senior citizens’ sit outs
  • Power back-up for common amenities

Bakeri Swara is built with construction elegance that sets standards for others to emulate :

  • First of its kind high rise building in the area
  • Large, secluded, and all-inclusive gated community in the midst of the city
  • Marquee-style corridors
  • Sitting lounge in every block
  • Lower stairs height for ease of climbing
  • Natural lighting and fresh air throughout the building
  • Complete fire safety
  • Best-in-class two lifts per building
  • China mosaic on terrace with facilities for terrace parties
  • Green plantation throughout the periphery and within the scheme

Specifications:

Flooring

  • Vitrified tiles in all rooms
Toilets
  • Anti-skid floor tiles and dado up to lintel level is all toilets
  • Good quality sanitary fittings
  • Hot and cold water mixer in all toilets
Kitchen
  • Granite platform with S.S. sink and dado of glazed tiles up to lintel level
Wall Finishes
  • Exterior walls having double coated plaster with acrylic paint
  • Interior walls having putty finish in all rooms
Doors-Windows
  • Main door with wooden frame and decorative shutter
  • All other doors with stone frames and flush doors
  • Anodized / powder coated aluminum windows with full glass and safety grills
  • Stone jambs at sill level for windows
Electrification
  • Single phase concealed copper wiring in 2BHK units and three phase concealed copper wiring in 3-4BHK units, with necessary points for geysers and air conditioners.
Others
  • Extra brick-bat concrete in addition to the usual thickness of slab, for better thermal insulation of top floor apartments to reduce the heat of summer months
  • China mosaic flooring and water proofing in terraces
  • Earthquake resistant structure


We have tie up with following institutions for Home Loans at our projects:

Solution for Easy and Prompt Finance
FINANCIAL INSTITUTIONS GIVING LOANS FOR DOWN PAYMENT
Institutions Address Contact Persons Contact No.
ONGC Branch, Makarpura Road, Vadodara - 390009 Mr. Vinod Yadav 7600037119
HDFC House, Tredent, Race Course, Vadodara - 390007 Mr. Amit Parihar 9879165622
3rd floor, Nutan Bharat Soc., Above Kotak Bank, Opp. CH Jwellers, B/H Concord Building, Vadodara – 390007 Mr. Vinod Singh 9898402731
Jay House, 42, Hari Bhakti Soc., Old Padra Road, Vadodara - 390007 Mr. Amit Patel 9898554983
GF 56 57 Ambalal Park, Coop Housing Society, Near Ambalal Park Corner, Water Tank Road Karelibaug, Baroda - 390018 Mr. Piyush Chaudhari 8866000145

Please note that majority of institutions mentioned above are giving door step services.

ALL CONTACT NUMBERS TO BE USED PREFFERABLY DURING OFFICE HOURS ONLY.



Click here to download brochure

APRIL TO JUNE PROGRESS
2018
APRIL TO JUNE PROGRESS
2017

As Of 3rd January, 2017

APRIL TO JUNE PROGRESS
Jan
APRIL TO JUNE PROGRESS
Feb
APRIL TO JUNE PROGRESS
Mar
April to June
April to June
April to June

As Of 3rd January, 2017

APRIL TO JUNE PROGRESS
June
APRIL TO JUNE PROGRESS
July
APRIL TO JUNE PROGRESS
August
APRIL TO JUNE PROGRESS
September
APRIL TO JUNE PROGRESS
October
APRIL TO JUNE PROGRESS
November
APRIL TO JUNE PROGRESS
December
April to June
April to June
April to June
April to June
April to June
Compliances :